Multi-agent single machine scheduling
نویسندگان
چکیده
We consider the scheduling problems arising when several agents, each owning a set of nonpreemptive jobs, compete to perform their respective jobs on one shared processing resource. Each agent wants to minimize a certain cost function, which depends on the completion times of its jobs only. The cost functions we consider in this paper are maximum of regular functions (associated with each job), number of late jobs and total weighted completion time. The different combinations of the cost functions of each agent lead to various problems, whose computational complexity is analysed in this paper. In particular, we investigate the problem of finding schedules whose cost for each agent does not exceed a given bound for each agent.
منابع مشابه
Optimum Aggregate Inventory for Scheduling Multi-product Single Machine System with Zero Setup Time
In this paper we adopt the common cycle approach to economic lot scheduling problem and minimize the maximum aggregate inventory. We allow the occurrence of the idle times between any two consecutive products and consider limited capital for investment in inventory. We assume the setup times are negligible. To achieve the optimal investment in inventory we first find the idle times which minimi...
متن کاملA Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes
In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem. Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...
متن کاملJIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملA Mathematical Model of a Multi-Criteria Parallel Machine Scheduling Problem: a Genetic Algorithm (RESEARCH NOTE)
.
متن کاملMulti-Agent System for Dynamic Manufacturing Scheduling using Meta-Heuristics
In this paper we will model a Manufacturing System by means of a Multi-Agent Systems, where each agent may represent a processing entity. This work has as objective to deal with the complex problem of Dynamic Scheduling in Manufacturing Systems. We want to prove that a good global solution for a scheduling problem may emerge from a community of machine agents solving locally their schedules and...
متن کاملSingle-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production
Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Annals OR
دوره 150 شماره
صفحات -
تاریخ انتشار 2007