Monitoring surgical performance using risk-adjusted cumulative sum charts.
نویسندگان
چکیده
The cumulative sum (CUSUM) procedure is a graphical method that is widely used for quality monitoring in industrial settings. More recently it has been used to monitor surgical outcomes whereby it 'signals' if sufficient evidence has accumulated that there has been a change in the surgical failure rate. A limitation of the standard CUSUM procedure in this context is that since it is simply based on the observed surgical outcomes, it may signal as a result of changes in the referral pattern, such as an increased proportion of high-risk patients, rather than due to a change in the actual surgical performance. We describe a new CUSUM procedure that adjusts for each patient's pre-operative risk of surgical failure through the use of a likelihood-based scoring method. The procedure is therefore ideally suited for settings where there is a variable mix of patients over time.
منابع مشابه
A risk adjusted self-starting Bernoulli CUSUM control chart with dynamic probability control limits
Usually, in monitoring schemes the nominal value of the process parameter is assumed known. However, this assumption is violated owing to costly sampling and lack of data particularly in healthcare systems. On the other hand, applying a fixed control limit for the risk-adjusted Bernoulli chart causes to a variable in-control average run length performance for patient populations with dissimilar...
متن کاملRisk-adjusted control charts based on LR-fuzzy data
Control charts are widely used in industrial processes as well as in health sciences and particularly for monitoring the performance of cardiac surgeon or a group of surgeons based on the preoperative risk of patients. Since the preoperative risk is a vague and nonprecise variable and the anesthesiologists after checking how many risk factors a patient has, determine the risk of mortality befor...
متن کاملBayesian Estimation of Change Point in Phase One Risk Adjusted Control Charts
Use of risk adjusted control charts for monitoring patients’ surgical outcomes is now popular.These charts are developed based on considering the patient’s pre-operation risks. Change point detection is a crucial problem in statistical process control (SPC).It helpsthe managers toanalyzeroot causes of out-of-control conditions more effectively. Since the control chart signals do not necessarily...
متن کاملPhase I Risk-Adjusted Control Charts for Monitoring Surgical Performance by Considering Categorical Covariates
In recent years risk-adjusted control charts have been increasingly studied for monitoring surgical outcomes by accounting for patients’ health conditions prior to surgery. However, most existing research focuses on phase II monitoring, and very little work has been done on phase I control of surgical outcomes. In this paper, a general phase I risk-adjusted control chart is proposed for monitor...
متن کاملMonitoring binary outcomes using risk-adjusted charts: a comparative study.
Monitoring binary outcomes when evaluating health care performance has recently become common. Classical statistical methodologies such as cumulative sum (CUSUM) charts have been refined and used for this purpose. For instance, the risk-adjusted CUSUM chart (RA-CUSUM) for monitoring binary outcomes was proposed for monitoring 30-day mortality following cardiac surgery. The RA-CUSUM inherits opt...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Biostatistics
دوره 1 4 شماره
صفحات -
تاریخ انتشار 2000