Inventory Control with Generalized Expediting
نویسندگان
چکیده
We consider a single-item, periodic review inventory control problem where discrete stochastic demand must be satisfied. When shortages occur, the unmet demand must be filled by some form of expediting. We allow a very general form for the cost structure of expediting, including the special case of lost sales. Examples of expediting are overtime production, where production is allowed above and beyond shortfall, and premium freight shipments, where backlogged products are built early the same period they are needed and then shipped very quickly. For the infinite horizon discounted problem, we characterize the structure of the optimal expediting policy and show that an (s, S) policy is optimal for regular production. In certain cases we demonstrate that it may be optimal to use overtime production to build up inventory over and above the shortfall. A numerical study is provided to add insight into the results.
منابع مشابه
Optimal Control of Unreliable Production/Inventory Systems with Expediting
In this paper, we study an unreliable multi-product production/inventory system consisting of N production machines and an assembly machine. The final products are assembled-to-order whereas components are built at N separate production machines on a make-to-stock routine. The objective of our study is to develop an integrated optimal control policy that minimizes the total long-run average cos...
متن کاملNote: A Separation Principle for a Class of Assemble-to-Order Systems with Expediting
In an assemble-to-order system, a wide variety of products are rapidly assembled from component inventories in response to customer orders. We assume that orders must be filled within a product-specific target lead time. In the event that some of the components required to fill an order are out of stock, these components must be expedited. The objective is to minimize the expected infinite-hori...
متن کاملSupply Chain Management with Guaranteed Delivery
We consider a two-stage supply chain under centralized control. The downstream facility faces discrete stochastic demand and passes supply requests to the upstream facility. The upstream facility always meets the supply requests from downstream. If the upstream facility cannot meet the supply requests from inventory on hand, the shortage must be filled by expediting, which will incur per unit a...
متن کاملOptimal Expediting Policies for a Serial Inventory System with Stochastic Lead Time and Visibility of Orders In Transit
Recent supply chains face higher volatility due to increased length and complexity. Cost pressure from severe competition drives industries to outsource its production to Asia, which in turn makes the supply chains long and complex. As a result, it is increasingly critical to manage supply chains actively to reduce uncertainty in delivery lead time and increase service rates. Often operating mu...
متن کاملThought Control Strategies in Generalized Anxiety Disorder and Major Depressive Disorder and Their Relationships with Trait Anxiety
Objective: The present study aims to investigate thought control strategies in Generalized Anxiety Disorder (GAD), Major Depressive Disorder (MDD), and the relationship of these metacognitive strategies with trait anxiety, as a construct of emotional vulnerability. Methods: 60 patients with diagnosis of GAD and MDD and 30 control subjects (nonpatients) were selected from the university stude...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Operations Research
دوره 58 شماره
صفحات -
تاریخ انتشار 2010