ore extraction and blending optimization model in poly- metallic open pit mines by chance constrained one-sided goal programming

نویسندگان

s. amir abrishamifar

چکیده

determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. one of the important operational constraints for optimization is the uniformity of metallic minerals grade after the blending process. this constraint directly affects the performance of the mineral processing plant. the sequence of extracting ore is usually determined by the order of pushbacks, which should be mined. metallic minerals’ grade in each pushback is stochastic in nature that comes from some statistical errors committed by the sampling. in such situations, decision making about the order of pushbacks for extraction as an exact defined process is not possible. moreover, the decision-maker should maximize the total net present value npv as the main objective of mining operations by considering the high performance of mineral processing plant. to deal with such cases, this research proposes a model based on the chance-constrained one-sided goal-programming and the obtained results from this procedure confirms the model’s reliability and correctness.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...

متن کامل

Development of a goal programming model for optimization of truck allocation in open pit mines

Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...

متن کامل

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

A Chance Constrained Multiple Objective Goal Programming Model of Fuzzy QFD and FMEA: Model Development

There are varieties of QFD combination forms available that can help management to choose the right model for his/her types of problem. The proposed MOCC-QFD-FMEA model is a right model to include variety of objectives as well as the risk factors into the model of the problem. Due to the fact that the model also takes into consideration the concept of Fuzzy set, it further allows management...

متن کامل

Application of stochastic programming for iron ore quality control

Stockpiling and blending play a major role in maintaining the quantity and quality of the raw materials fed into processing plants, especially the cement, iron ore and steel making, and coal-fired power generation industries that usually require a much uniformed feed. Due to the variable nature of such materials, they even come from the same source and the produced ores or concentrates are seld...

متن کامل

Fractional Chance Constrained Programming: A Fuzzy Goal Programming Approach

There are many cases that a nonlinear fractional programming, generated as a result of studying fractional stochastic programming, must be solved. Sometimes an approximate solution may be sufficient enough to start a new process of calculations. To this end, this author introduces a new linear approximation technique for solving a fractional chance constrained programming (CCP) problem. After i...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
journal of industrial engineering, international

ISSN 1735-5702

دوره 7

شماره 15 2011

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023