palm oil mill effluent digestion in an up-flow anaerobic sludge fixed film bioreactor
نویسندگان
چکیده
the effect of organic loading rate (olr) provided by hydraulic retention time (hrt) and influent chemical oxygen demand (codin) on the performance of an up-flow anaerobic sludge fixed film (uasff) bioreactor treating palm oil mill effluent (pome) was studied. anaerobic digestion of pome was modeled and analyzed with two variables i.e. hrt and codin. experiments were conducted based on a general factorial design and analyzed using response surface methodology (rsm). the region of exploration for digestion of pome was taken as the area enclosed by hrt (1 to 6 days) and codin (5260 to 34725 mg/l) boundaries. a simultaneous increase of the variables determined a decrease of cod removal efficiency, srt and srf and an increase of cod removal rate, vfa/alk., co2 fraction in biogas, methane production rate. the best cod removal rate for pome treatment in an anaerobic hybrid reactor has obtained at an olr of 17.6 g cod/l.d while it was at 26.21 g cod/l.d (corresponds to codin of 26210 mg cod/l and hrt of 1 day) in the present study. minimum and maximum srt values obtained were 16 and 1904 days at olr of 34.73 and 0.88 g cod/l.d, respectively. the present study provides valuable information about interrelations of quality and process parameters at different values of the operating variables.
منابع مشابه
Pretreated Palm Oil Mill Effluent (POME) Digestion in an Up-Flow Anaerobic Sludge Fixed Film Bioreactor: a Comparative Study
An up-flow anaerobic sludge fixed film (UASFF) bioreactor was used to treat the pretreated palm oil mill effluent (POME). In physical pretreatment, POME was pre-settled for 2 h and the supernatant was fed into the reactor. In chemical pretreatment, optimum dosages of cationic and anionic polymers were used. Experiments of pretreated POME digestion were conducted based on a central composite fac...
متن کاملMicrobial Communities and Their Performances in Anaerobic Hybrid Sludge Bed-Fixed Film Reactor for Treatment of Palm Oil Mill Effluent under Various Organic Pollutant Concentrations
The anaerobic hybrid reactor consisting of sludge and packed zones was operated with organic pollutant loading rates from 6.2 to 8.2 g COD/L day, composed mainly of suspended solids (SS) and oil and grease (O&G) concentrations between 5.2 to 10.2 and 0.9 to 1.9 g/L, respectively. The overall process performance in terms of chemical oxygen demands (COD), SS, and O&G removals was 73, 63, and 56%,...
متن کاملElectrocoagulation of Palm Oil Mill Effluent
Electrocoagulation (EC) is an electrochemical technique which has been employed in the treatment of various kinds of wastewater. In this work the potential use of EC for the treatment of palm oil mill effluent (POME) was investigated. In a laboratory scale, POME from a factory site in Chumporn Province (Thailand) was subjected to EC using aluminum as electrodes and sodium chloride as supporting...
متن کاملAnaerobic Treatment of Palm Oil Mill Effluent in Pilot-Scale Anaerobic EGSB Reactor
Large volumes of untreated palm oil mill effluent (POME) pose threat to aquatic environment due to the presence of very high organic content. The present investigation involved two pilot-scale anaerobic expanded granular sludge bed (EGSB) reactors, continuously operated for 1 year to treat POME. Setting HRT at 9.8 d, the anaerobic EGSB reactors reduced COD from 71179 mg/L to 12341 mg/L and recy...
متن کاملProduction of Biogas from Palm Oil Mill Effluent at Pilot Scale: Effect of Recycle Sludge
An anaerobic digestion of palm oil mill effluent (POME) for production of biogas was carried out at pilot scale under thermophilic condition. The objective of this research is to maintain short hydraulic retention time (HRT) and high degradation of the POME to biogas by applying recycle sludge. Fresh POME from PTPN IV without further treatment was used as feed. The fermentation process occurred...
متن کاملReactivation of Preserved Aerobic Granular Sludge Using Palm Oil Mill Effluent
Generation of wastes in the form of palm oil mill effluent (POME) is unavoidable due to increase in oil palm development worldwide. Direct discharge of POME into receiving water bodies is strongly discouraged due to high chemical and biochemical oxygen demand concentrations, respectively. Aerobic granulation technology features microbial aggregates generated following immobilization and cell-to...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
international journal of environmental researchجلد ۱، شماره ۳، صفحات ۳۵-۳۶۷
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023