Visualisation of Train Punctuality – Illustrations and Cases

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Visualisation and Simulation of Pedestrians at Train Stations

Space utilization by humans is an important aspect in building design, especially for buildings with a substantial flow of pedestrians like train stations. We aim at a simulation of pedestrian flows as a visual feedback in the planning phase of buildings. The simulation has to provide feedback for the layout and dimensions of floor space. This includes the general organization of space as well ...

متن کامل

Punctuality analysis by the microscopic simulation and visualization of web-based train information system data

In order to increase the robustness of a railway system, the detailed analysis for a combination of tracks, signalling systems, timetables and operation of trains is indispensable. We introduce an approach to foresee and analyse punctuality for railway lines where trains are densely operated. Our approach consists of three phases, namely, the analysis of the current situation of train operation...

متن کامل

Punctuality and Railway Maintenance

The iron ore railway in northern Scandinavia is a single track line that stretches from the Gulf of Bothnia to the Norwegian Sea. Mixed traffic on a single-track railway makes the traffic sensitive and prone to disturbances. To improve punctuality and efficiency in the traffic flow, the link between disturbances and their impacts on train delays needs to be analysed and understood more precisel...

متن کامل

PAYGO for Punctuality

The federal budgeting process is wrought with conflict that makes it nearly impossible for the budget to be passed on time, or so it seems. One aspect overlooked is the effects of statutory Pay-As-You-Go (PAYGO) rules. The cursory evidence indicates PAYGO may be beneficial under certain circumstances. The analysis relies on an Autoregressive-Moving-Average (ARMA) time series model with data fro...

متن کامل

"Punctuality" and Verb Semantics

Whether verbs have to be marked as punctual vs. durative has been a controversial issue from the very beginnings of research on aktionsarten in the last century right on up to modern theories of aspectual classes and aspect composition. Debates about the linguistic necessity of this distinction have often been accompanied by the question of what it means for a verb to be temporally punctual. In...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transportation Research Procedia

سال: 2017

ISSN: 2352-1465

DOI: 10.1016/j.trpro.2017.12.092