Transmission Network Expansion Planning Based on Dependent-chance Bi-level Programming Method
نویسندگان
چکیده
منابع مشابه
Transmission expansion planning based on merchandizing surplus of transmission lines
This paper proposes an optimal transmission expansion planning (TEP) which is based on determining share of each line in merchandizing surplus (MS) of system, determining by Independent System Operator (ISO). The more share of a line in MS of system denotes the priority of a line for expansion. The procedure of determining MS of each line in a power system is based on determining the MS share o...
متن کاملRegulatory Impacts on Distributed Generation and Upstream Transmission Substation Expansion Planning: A Novel Stochastic Bi-level Model
In this paper, a novel framework is proposed to study impacts of regulatory incentive on distributed generation (DG) investment in sub-transmission substations, as well as upgrading of upstream transmission substations. Both conventional and wind power technologies are considered here. Investment incentives are fuel cost, firm contracts, capacity payment and investment subsidy relating to wind ...
متن کاملA Multi-objective Transmission Expansion Planning Strategy: A Bilevel Programming Method
This paper describes a methodology for transmission expansion planning (TEP) within a deregulated electricity market. Two objective functions including investment cost (IC) and congestion cost (CC) are considered. The proposed model forms a bi-level optimization problem in which upper level problem represents an independent system operator (ISO) making its decisions on investment while in the l...
متن کاملA Multistage Decision-Dependent Stochastic Bi-level Programming Approach for Power Generation Investment Expansion Planning
In this paper, we study the long-term power generation investment expansion planing problem under uncertainty. We propose a bilevel optimization model that includes an upper-level multistage stochastic expansion planning problem and a collection of lower-level economic dispatch problem. This model seeks for the optimal sizing and siting for both thermal and wind power units to be built to maxim...
متن کاملTransmission-expansion planning based on anon-linear programming algorithm
In this formulation, the objective function and operating constraints include the corona power-loss term. The objective function consists of three terms: cost of investment of new transmission lines, ohmic power loss of new and existing lines, and corona-power loss of new lines. This combination of terms results in a non-linear objective function. The non-linear programming or the non-convex op...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of International Council on Electrical Engineering
سال: 2014
ISSN: 2234-8972
DOI: 10.5370/jicee.2014.4.1.011