Towards methodological adventure in cost overrun research: linking process and product

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Cost Overrun Simulation in Software Product Line Development

The cost of a Software Product Line (SPL) development project sometimes exceeds the initially planned cost, because of requirements volatility and poor quality. In this paper, we propose a cost overrun simulation model for time-boxed SPL development. The model is an enhancement of a previous model, specifically now including: consideration of requirements volatility, consideration of unplanned ...

متن کامل

Towards lean product and process development

Successes in lean manufacture have led researchers and practitioners to consider extending ‘lean’ to different parts of the engineering enterprise, including product and process development (PPD). Lean product development (PD) has been understood to mean lean manufacture applied to PD, while the roots of lean PD – just like lean manufacture go back to Toyota. This paper presents the methodology...

متن کامل

(LeanPD) Towards Lean Product and Process Development

Successes in lean manufacture have led researchers and practitioners to consider extending ‘lean’ to different parts of the engineering enterprise, including product and process development (PPD). Lean product development (PD) has been understood to mean lean manufacture applied to PD, while the roots of lean PD – just like lean manufacture go back to Toyota. This paper presents the methodology...

متن کامل

Managing Cost Overrun Risk in Project Funding Allocation

This paper discusses decision making of project funding allocation under uncertain project costs. Because project costs are uncertain and funding allocations may not necessarily match the costs required, each project is inherently subject to a cost overrun risk (COR). In this paper, a model is proposed in which project cost is treated as a factor with a probability density function. The decisio...

متن کامل

Towards a Product Derivation Process Framework

Inefficient product derivation practices can greatly diminish the productivity gains expected from a software product line approach. As a foundation for systematic and efficient product derivation a better understanding of the underlying activities in industrial product line development is required. We have developed a process framework that comprises important tasks product line stakeholders h...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Construction Management

سال: 2021

ISSN: 1562-3599,2331-2327

DOI: 10.1080/15623599.2021.1894632