TOOLS FOR OPTIMIZING PRODUCTION MANAGEMENT TAKING INTO ACCOUNT PRICING MODELS

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Region sown areas portfolio optimization taking into account crop production economic risk

Grain production is one of the Ukrainian agro-industrial complex main branches. An indicator of the grain production efficiency is its profitability. It is characterized by significant annual fluctuations that induce risk. Redistribution of existing grain crops areas taking into consideration their profitability can bring to increase of production efficiency. The paper observes Markowitz’s opti...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

Efficient electricity production portfolios taking into account physical boundaries

In this paper the efficiency of the electricity generation portfolio of BKW, a major Swiss utility, is analyzed. By applying mean-variance portfolio theory to the current and to possible future generation mixes, efficient frontiers are derived. The analysis based on relative changes in generation costs is complemented by an actual costs analysis. Moreover, a method that takes into account physi...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

Taking Handicap into Account: Systemic Features

Because of many features of handicap, such as the number of actors and interactions, the complexity of the field, handicap must be considered from a system point of view, and dealt with as any system. That makes it possible to build a comprehensive response to the question of the inclusion and full citizenship of people with disabilities, better than some fragmentary solutions often proposed. T...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Polythematic Online Scientific Journal of Kuban State Agrarian University

سال: 2017

ISSN: 1990-4665

DOI: 10.21515/1990-4665-131-079