The Factors Affecting on Earned Value Management

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Earned - Value Management Terminology

To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...

متن کامل

The Costs and Benefits of the Earned Value Management Process

The question of whether the benefits of the earned value management process exceed the costs has not been adequately reported in the literature. Several studies report the costs but ignore the benefits. Others focus on the benefits, but ignore the costs. For example, a widely circulated report by Coopers & Lybrand and TASC (1994) concludes that the DOD regulatory cost is significant, and the re...

متن کامل

An Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past ca...

متن کامل

A fuzzy approach for the earned value management

The earned value technique is a crucial technique in analyzing and controlling the performance of a project which allows a more accurate measurement of both the performance and the progress of a project. This paper presents a new fuzzy-based earned value model with the advantage of developing and analyzing the earned value indices, and the time and the cost estimates at completion under uncerta...

متن کامل

Factors Affecting the Sustainable Forest Management

The major purpose of this study is to assess the perception of managers in the Forest, Range and WatershedOrganization. It is an applied study by using descriptive–correlative method. A questionnaire was developedand data collected from 105 respondents. The validity and reliability of questionnaires was verified. Theresults of study show that there was a relationship between educational level, ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2020

ISSN: 1757-899X

DOI: 10.1088/1757-899x/901/1/012023