Sustainable multi-objective scheduling for automatic guided vehicle and flexible manufacturing system by a grey wolf optimization algorithm
نویسندگان
چکیده
منابع مشابه
A HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL
This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...
متن کاملMulti-Objective Tooling Optimization for Sustainable Manufacturing
Process planning is an activity for designers to evaluate manufacturability and manufacturing cost in the early design stage of mechanical parts production where important parameters that affect the machining process should be analyzed in detail. This paper deals with the systematic determination of the detailed methods involved in the manufacturing of parts from raw materials to a finished pro...
متن کاملA multi-objective memetic algorithm for risk minimizing vehicle routing problem and scheduling problem
In this paper, a new approach to risk minimizing vehicle routing and scheduling problem is presented. Forwarding agents or companies have two main concerns for the collection of high-risk commodities like cash or valuable commodities between the central depot and the customers: one; because of the high value of the commodities transported, the risk of ambush and robbery are very high. Two; the ...
متن کاملA Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations
In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...
متن کاملTask Scheduling of Automated Guided Vehicle in Flexible Manufacturing System using Ant Colony Optimization
Flexible Manufacturing System (FMS),equipped with several CNC machines and Auto Guided Vehicle (AGV) based material handling systems has been designed and implemented to have the flexibility and efficiency in production process. After the implementation of FMS, various problems came such as the scheduling of the resources, such as frequent variation in the parts, tools, AGV routings, becomes a ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Data and Network Science
سال: 2018
ISSN: 2561-8148,2561-8156
DOI: 10.5267/j.ijdns.2018.6.001