Supervisor ratings of productivity loss associated with presenteeism and sick leave due to musculoskeletal disorders and common mental disorders in Sweden
نویسندگان
چکیده
BACKGROUND: Health problems due to musculoskeletal disorders (MSD) and common mental (CMD) result in costs lost productivity. OBJECTIVE: This study aimed increase knowledge of employers’ productivity loss employees’ presenteeism sickness absence. METHODS: A web questionnaire was sent employers workers who were sick-listed for more than 30 days MSD or CMD, response rate: 50%, n = 198. Presenteeism the impact on before after sick leave, performance work tasks by replacement during measured using supervisors’ ratings. RESULTS: The average per sick-leave case amounted almost 10 weeks, 53%of attributable 47%to lower workers. Employees with a CMD diagnosis had significantly higher presenteeism-related those MSD. CONCLUSIONS: Employers experienced substantial associated leave. Whether supervisory rating is preferable employee self-rating needs be studied further. long duration counter-productive resource-efficient organisations indicates need improved skills identify poor health, both
منابع مشابه
Sick leave patterns in common musculoskeletal disorders – a study of doctor prescribed sick leave
BACKGROUND Comparative data on sick leave within musculoskeletal disorders (MSDs) is limited. Our objective was to give a descriptive overview of sick leave patterns in different MSDs. METHODS Using electronic medical records, we collected information on dates and diagnostic codes for all available sick leave certificates, during 2 years (2009-2010), in the North Western part of the Skåne reg...
متن کاملEffects of physical and personal risk factors on sick leave due to musculoskeletal disorders.
The purpose of this study was to investigate the effects of physical and personal risk factors on sick leave due to musculoskeletal disorders in an Iranian car company. In this cross-sectional study, 234 workers participated and all of them had sick leave due to musculoskeletal disorders in the past year. A physical risk factor checklist and personal information questionnaire were used as data-...
متن کاملFactors associated with first return to work and sick leave durations in workers with common mental disorders.
BACKGROUND Associations are examined between socio-demographic, medical, work-related and organizational factors and the moment of first return to work (RTW) (within or after 6 weeks of sick leave) and total sick leave duration in sick leave spells due to common mental disorders. METHODS Data are derived from a Dutch database, build to provide reference data for sick leave duration for variou...
متن کاملEffectiveness of early part-time sick leave in musculoskeletal disorders
BACKGROUND The importance of staying active instead of bed rest has been acknowledged in the management of musculoskeletal disorders (MSDs). This emphasizes the potential benefits of adjusting work to fit the employee's remaining work ability. Despite part-time sick leave being an official option in many countries, its effectiveness has not been studied yet. We have designed a randomized contro...
متن کاملIs an expert diagnosis enough for assessment of sick leave for employees with musculoskeletal and mental disorders?
PURPOSE The aim of this study is to determine differences in self-reported work ability, work conditions, health and function between ICD-10 groups with musculoskeletal disorders (MSD), mental disorders (MDs) and MSD + MD and to determine which variables are associated with sick leave. METHOD A cross-sectional study of 210 employees was conducted at an occupational health service unit. Physio...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Work-a Journal of Prevention Assessment & Rehabilitation
سال: 2021
ISSN: ['1051-9815', '1875-9270']
DOI: https://doi.org/10.3233/wor-213439