Study on Indirect Tensile Strength of Plastic Waste Bituminous Concrete for Road Construction

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Improving the Performance of Bituminous Concrete Mix by Waste Plastic

The population of our country is increasing rapidly and due to it plastic waste is also increasing day to day due to urbanization, development activities and changes in life style, which leading extensive environment pollution. Thus disposal of waste plastic is a threat and become a serious problem globally due to their nonbiodegradability and anaesthetic view. Since these are not disposed scie...

متن کامل

The Efficiency of Hybrid BNN-DWT for Predicting the Construction and Demolition Waste Concrete Strength

The current study focuses on two main goals. First, with the use of construction and demolition (C&D) of building materials, a new aggregate was produced and it was utilized for green concrete production. The compressive strength test confirmed the good function of C&DW aggregate concrete. This concrete did not show significant differences with natural sand concrete. Second, Backpropagation neu...

متن کامل

On Applicability of Some Indirect Tests for Estimation of Tensile Strength of Anisotropic Rocks

The tensile strength of rocks plays a noteworthy role in their failure mechanism, and its determination can be beneficial in optimizing the design of the rock structures. Schistose rocks due to their inherent anisotropy in different foliation directions show a diverse strength at each direction. The purpose of this work was to compare and assess the tensile strength of phyllite, which was obtai...

متن کامل

Road-mix vs. Plant-mix in Bituminous Road Construction

below the surface through scarifier teeth. Emulsions and medium-curing and slow-curing asphalts were used. The travelling plant-mix was not entirely satisfactory because of conditions existing on this project. It is necessary to have the windrow of material quite wet in order to get it through the travelling pug-mill mixer. The project was built late in the fall, and the water did not evaporate...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Romanian Journal of Transport Infrastructure

سال: 2018

ISSN: 2286-2218

DOI: 10.2478/rjti-2018-0006