Solving Process Planning, ATC Scheduling and Due-date Assignment Problems Concurrently Using Genetic Algorithm for Weighted Customers
نویسندگان
چکیده
منابع مشابه
Solving Weighted Number of Operation Plus Processing Time Due-Date Assignment, Weighted Scheduling and Process Planning Integration Problem Using Genetic and Simulated Annealing Search Methods
Traditionally, the three important manufacturing functions, which are process planning, scheduling and due-date assignment, are performed separately and sequentially. For couple of decades, hundreds of studies are done on integrated process planning and scheduling problems and numerous researches are performed on scheduling with due date assignment problem, but unfortunately the integration of ...
متن کاملSolving railway line planning problems using a decomposition algorithm
The passenger line planning is a process of strategic long-term decision-making problem in the field of railway passenger planning. A line is a route between starting point and destination with certain stops, which has a certain frequency of train schedule. A new solution based on decomposition algorithm has been proposed in this paper, which is defined in a master problem and two sub problems....
متن کاملGenetic Algorithm for Solving Berth and Quay Cranes Assignment problems
The management of a container terminal is a complex process that involves a vast number of decisions. The berth is the most important resource that affects the capacity of the terminal. The problem is here to allocate berths to arriving vessels and to determine which cranes in the berths process the docked vessels. For creating the berth schedule, the calling schedule of vessels, favourable ber...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flowtime through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters with it, this is why in recent decades extensive researches have been done on scheduling issues. A type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical ...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Academic Platform-Journal of Engineering and Science
سال: 2018
ISSN: 2147-4575
DOI: 10.21541/apjes.318451