Solar Active Building with Directly Heated Concrete Floor Slabs
نویسندگان
چکیده
منابع مشابه
Concrete Floor Slabs on Grade Subjected to Heavy Loads
Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 1Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....
متن کاملSimulated thermal performance of a solar heated floor
A low cost, simple solar heating system consisting of an active collector with an In-Floor Heat Distribution and Storage (IFHDS) system was developed in response to the energy crisis of the 1970s. A two-dimensional finite difference model was developed and used to simulate the performance of IFHDS system cross-sections. Simulation runs were conducted with a steady-periodic model for the tempera...
متن کاملAutomated Lower Bound Analysis of Concrete Slabs
The problems caused by using different methods for the design of concrete slabs, and their subsequent reanalysis for assessment, were highlighted in an earlier paper [1]. If the original calculations have been lost it is common for structures to be condemned because the checker does not know the original designer’s logic. In many cases the design was carried out by hand calculation, often using...
متن کاملBehaviour of fibre reinforced concrete slabs
This paper presents a comparison of the properties of concrete slabs when two types of fibres are added. One specimen had no fibres and acted as a control specimen. The remaining four specimens had steel and polypropylene fibres added in the volumetric ratio of 0.5% and 1.0%. The dimensions of the slab specimens were 820×820×80 mm and were supported by four rollers at their edges. A displacemen...
متن کاملStructural Consideration in Design of Reinforced Concrete Slabs with Openings
Over 90% of framed structures in Uganda are built from reinforced concrete. Prior to the 1990’s, most buildings had no openings in slabs, yet in city centers buildings butt against each other with widows at front and back only. This limited retail activities to front rooms of the ground floor and the buildings had to be narrow. A baseline survey of 50 shopping malls in Kampala Central Business ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Energy Procedia
سال: 2014
ISSN: 1876-6102
DOI: 10.1016/j.egypro.2014.02.066