Single-machine scheduling with an external resource

نویسندگان

چکیده

This paper studies the complexity of single-machine scheduling with an external resource, which is rented for a non-interrupted period. Jobs that need this resource are executed only when available. There cost associated jobs and duration renting period resource. We look at four classes problems resource: class where budgeted needs to be minimized, two-objective both, cost, linear combination minimized. provide thorough analysis (NP-hardness proofs (pseudo-)polynomial algorithms) different members these classes.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single Machine Scheduling with Resource Dependent

Abstract We consider the single machine scheduling problem with resource dependent release times and processing times, in which both the release times and processing times are strictly linear decreasing functions of the amount of resources consumed. The objective is to minimize the makespan plus the total resource consumption costs. We propose a heuristic algorithm for the general problem by ut...

متن کامل

JIT single machine scheduling problem with periodic preventive maintenance

This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...

متن کامل

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

Bicriterion Single Machine Scheduling with Resource Dependent Processing Times

A bicriterion problem of scheduling jobs on a single machine is studied. The processing time of each job is a linear decreasing function of the amount of a common discrete resource allocated to the job. A solution is specified by a sequence of the jobs and a resource allocation. The quality of a solution is measured by two criteria, F1 and F2. The first criterion is the maximal or total (weight...

متن کامل

Single Machine Scheduling with a Non-renewable Financial Resource

In this paper, we consider single machine scheduling problems with a non-renewable resource. This type of problems has not been intensively investigated in the literature so far. For several problems of this type with standard objective functions (namely the minimization of makespan, total tardiness, number of tardy jobs, total completion time and maximum lateness), we present some complexity r...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2021

ISSN: ['1872-6860', '0377-2217']

DOI: https://doi.org/10.1016/j.ejor.2020.12.045