Simulation and Comparison Analysis of Due Date Assignment Methods Using Scheduling Rules in a Job Shop Production System
نویسندگان
چکیده
منابع مشابه
Comparison Analysis of Due Date Assignment Methods Using Scheduling Rules in a Job Shop Production System
This paper presents a simulation and comparison analysis conducted to investigate the due-date assignment methods through various scheduling rules. The due date assignment methods investigated are flow time due date (FTDD) and total work content (TWK) method. Three scheduling rules are integrated in the simulation for scheduling of jobs on machines. The performance of the study is evaluated bas...
متن کاملGene expression programming based due date assignment in a simulated job shop
In this paper, a new approach for due date assignment in a multi-stage job shop is proposed and evaluated. The proposed approach is based on a genetic programming technique which is known as gene expression programming (GEP). GEP is a relatively new member of the genetic programming family. The primary objective of this research is to compare the performance of the proposed due date assignment ...
متن کاملA Comparison of Job-Shop and Group Technology Using Simulation by ARENA
Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own pros and cons, each of which is suitable to a specific kind of factory. ...
متن کاملA Comparison of Job-Shop and Group Technology Using Simulation by ARENA
Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own pros and cons, each of which is suitable to a specific kind of factory. ...
متن کاملA Comparison of Job-shop and Group Technology Using Simulation by ARENA
Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own cons and pros, each of which is suitable to a specific kind of factory. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Computer Science & Engineering Survey
سال: 2015
ISSN: 0976-3252,0976-2760
DOI: 10.5121/ijcses.2015.6503