منابع مشابه
Jobshop Scheduling in a Shipyard
Jobshop scheduling is considered a standard problem to solve by means of Genetic Algorithms (GA) and a number of articles have been written about this subject [3]. In spite of this, only few applications of GA have been published [2] on real jobshop scheduling problems. Even though some applications may not be published for business related reasons, more practical applications seem necessary, i...
متن کاملControl of Shipboard Cranes
We propose a new shipboard crane configuration for offloading cargo in open seas. We show that the “Maryland Rigging” crane of ship’s configuration, used in association with a friction control mechanism, provides a very effective method for reducing load pendulation caused by the motion of the crane in the roll direction. The effectiveness of the control technique is obtained by comparing the p...
متن کاملDynamic Analysis of Cranes
The objective of this paper is to analyze the crane structures as a step to study their effects on the structures working integrally with them. The interaction between cranes and those structures has dominant effects on the global system behavior. Crane structures may have many forms of space structures. It is not logical or economical to perform experimental modal analysis to all of them to in...
متن کاملAdvances in Container Cranes Automation
This paper summarizes the most important advances of the used crane control technology in perspective of automatic operation of container cranes. Faster and more productive container cranes demands highly efficient yard system. Storage capacity is the limitation for most terminals today; automatic operation offers optimum stacking density and peak capacity equivalent for continuous manning of e...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Scientific American
سال: 1917
ISSN: 0036-8733
DOI: 10.1038/scientificamerican06091917-362supp