Setting tolerance limits for statistical project control using earned value management
نویسندگان
چکیده
منابع مشابه
Setting tolerance limits for statistical project control using earned value management ¬リニ
Project control has been a research topic since decades that attracts both academics and practitioners. Project control systems indicate the direction of change in preliminary planning variables compared with actual performance. In case their current project performance deviates from the planned performance, a warning is indicated by the system in order to take corrective actions. Earned value ...
متن کاملSelf-Starting Control Chart and Post Signal Diagnostics for Monitoring Project Earned Value Management Indices
Earned value management (EVM) is a well-known approach in a project control system which uses some indices to track schedule and cost performance of a project. In this paper, a new statistical framework based on self-starting monitoring and change point estimation is proposed to monitor correlated EVM indices which are usually auto-correlated over time and non-normally distributed. Also, a new ...
متن کاملAn ex ante control chart for project monitoring using earned duration management observations
In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...
متن کاملA multivariate approach for top-down project control using earned value management
a r t i c l e i n f o Project monitoring and the related decision to proceed to corrective action are crucial components of an integrated project management and control decision support system (DSS). Earned value management/earned schedule (EVM/ES) is a project control methodology that is typically applied for top-down project schedule control. However , traditional models do not correctly acco...
متن کاملEstimation of Project Performance Using Earned Value Management and Fuzzy Regression
Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Omega
سال: 2014
ISSN: 0305-0483
DOI: 10.1016/j.omega.2014.06.001