Scheduling of Resource-Constrained Projects

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Quality- and profit-oriented scheduling of flexible resource-constrained projects

We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with respect to the implementation of the optional activities. Such decisions affect the duration, cost, qual...

متن کامل

Scheduling resource-constrained projects with a flexible project structure

In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally implemented activities. However, established model formulations and solution approaches for the resourc...

متن کامل

Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements

We consider the resource-constrained project scheduling problem. The purpose of this paper is to direct the focus to a branch-and-bound concept that can, by simple adaptations, operate on a wide range of problem settings. The general approach can, e.g., deal with multi-mode problems, resource availability varying with time, and a wide range of objectives. Even the simple assembly line balancing...

متن کامل

resource-constrained scheduling of construction projects using the harmony search algorithm

during the implementation, construction projects usually encounter situation that considerably affects the project scheduling and cost. this study aims at using an improved version of the harmony search algorithm (hsa) to schedule resource constrained construction projects. this model is formulated as a global optimization problem. it will determine the duration of each activity to minimize the...

متن کامل

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Operational Research Society

سال: 2001

ISSN: 0160-5682,1476-9360

DOI: 10.1057/palgrave.jors.2601247