Risk management for design and construction

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Construction Management Risk System (CMRS) for Construction Management (CM) Firms

After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM) firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence...

متن کامل

Design and Construction of an Electromagetic Supension System for Vehicles

This paper introduces a novel passive suspension system for ground vehicles. This system is based on a flexible Electromagnetic Shock Absorber (EMSA). In the proposed system, efforts are made to a) select a high damping coefficient usable in a car b) determine Physical dimensions and geometry not much different from those of the mechanical shock absorbers and c) seletct EMSA weight and volume l...

متن کامل

Design and construction of fruit solar drier for rural settlements

This research focuses on the need for preserving fruits in rural areas to prevent waste. The solar drier is made of vital chambers i.e. the concentrator chamber (that harvests the solar irradiance), the transport pipe (that transports the heat generated by convection) and hanger chamber (where the fruits are placed). The temperature within the concentrator chamber and hanger chamber was monitor...

متن کامل

Design and Construction of an Electromagetic Supension System for Vehicles

This paper introduces a novel passive suspension system for ground vehicles. This system is based on a flexible Electromagnetic Shock Absorber (EMSA). In the proposed system, efforts are made to a) select a high damping coefficient usable in a car b) determine Physical dimensions and geometry not much different from those of the mechanical shock absorbers and c) seletct EMSA weight and volume l...

متن کامل

Risk Management in construction industry

Construction industry is highly risk prone, with complex and dynamic project environments creating an atmosphere of high uncertainty and risk. The industry is vulnerable to various technical, sociopolitical and business risks. The track record to cope with these risks has not been very good in construction industry. As a result, the people working in the industry bear various failures, such as,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Construction Economics and Building

سال: 1970

ISSN: 2204-9029

DOI: 10.5130/ajceb.v12i1.2487