Research on Synthesis Method of a Loop Decoupling Two-rotation Parallel Mechanism with Large Load Bearing Capacity
نویسندگان
چکیده
منابع مشابه
Effect of Fuzzy Boundaries on the Bearing Capacity of Footings on Two-Layered Clay
In this study, fuzzy logic was implemented to formulate the fuzziness of layer boundaries for a two-layered clay soil. A field of two-layered clay with fuzzy boundaries between layers was generated, and then the bearing capacity of strip footing on this field was calculated by the assumption of plane-strain conditions. The Mohr-Coulomb failure criterion was used and bearing capacity calculation...
متن کاملsynthesis of platinum nanostructures in two phase system
چکیده پلاتین، فلزی نجیب، پایدار و گران قیمت با خاصیت کاتالیزوری زیاد است که کاربرد های صنعتی فراوانی دارد. کمپلکس های پلاتین(ii) به عنوان دارو های ضد سرطان شناخته شدند و در شیمی درمانی بیماران سرطانی کاربرد دارند. خاصیت کاتالیزوری و عملکرد گزینشی پلاتین مستقیماً به اندازه و- شکل ماده ی پلاتینی بستگی دارد. بعضی از نانو ذرات فلزی در سطح مشترک مایع- مایع سنتز شده اند، اما نانو ساختار های پلاتین ب...
single-step synthesis of multi-component spirobarbiturates using ionic liquids and synthesis of substituted pyridine filled with catalysts supported on solid substrate
in this thesis, a better reaction conditions for the synthesis of spirobarbiturates catalyzed by task-specific ionic liquid (2-hydroxy-n-(2-hydroxyethyl)-n,n-dimethylethanaminium formate), calcium hypochlorite ca(ocl)2 or n-bromosuccinimide (nbs) in the presence of water at room temperature by ultrasonic technique is provided. the design and synthesis of spirocycles is a challenging task becaus...
15 صفحه اولeffect of sub-grid scales on large eddy simulation of particle deposition in a turbulent channel flow
چکیده ندارد.
15 صفحه اولA comment on scheduling two parallel machines with capacity constraints
In a recent paper [Discrete Appl. Math. 130 (2003) 449–467], Yang, Ye, and Zhang investigate the problem of scheduling independent jobs on two identical machines, with a limit on the number of jobs that can be assigned to each single machine, so as to minimize the total weighted completion time of the jobs. They provide a semidefinite programming based, polynomial time approximation algorithm w...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Jixie gongcheng xuebao
سال: 2021
ISSN: ['0577-6686']
DOI: https://doi.org/10.3901/jme.2021.21.068