Purpose The causes of high-speed railway failures are complex, and it is difficult to quantitatively accurately describe safety evaluation. purpose this paper construct a model ensure the operations. Design/methodology/approach authors operation evaluation index system from four aspects: personnel, equipment, environment management analyze inter-coupling relationship various factors. Based on system, use network analytic hierarchy process (ANP) fuzzy comprehensive will be used establish model. Findings Through literature investigation field investigation, combined with key points composition, 4 first-level indicators 17 second-level were selected system. It can seen results that personnel signal control have largest weight. Originality/value On basis establishing an comprehensively considering internal coupling between indexes fuzziness evaluation, uses ANP analysis method operation, has certain advantages practicability in case relative lack data fault data.
منابع مشابه
Research on Capacity Calculation & Assessment Framework for Chinese High Speed Railway based on UIC406
Railway capacity is not only the basic condition for the allocation of railway resources but also an index set for the evaluation of the usage of them. Sometimes the maximum theoretical results calculated according to the coefficient methodology for the capacity calculation of the Existed Chinese traditional railway (abbreviated as ECTR) would be less than those statistical results from the rea...
متن کاملRisk ASSessment ) : Risk Assessment on High Speed GSM - R network
Within the framework of high speed / high capacity lines operated by ERTMS system (GSM-R, ETCS) a research has been carried out on the possible cause of degradation of GSM-R system, related risks and possible mitigations. Location of the critical zones from the propagation point of view, localization of the possible sources of degradation of the functionality of the system and sources of electr...
متن کاملRisk Assessment on Operating Tunnels of High-Speed Railway in Perilous and Mountainous Area
The project named “the rescue system and key technology of high-speed railway in perilous mountains” primarily focuses on current railway constructions and operations in China. To state the relationship between risk events and risk factors, we classified the risk sources of operating tunnels of high-speed railway in perilous and mountainous area and established a hierarchical assessment system ...
متن کاملRisk Assessment of NPD Project Based on ANP
Abstract There are a lot of risks in new product development projects. It’s very important to assess these risks accurately for the success of these projects. This paper proposed a risk assessment approach of NPD projects based on analytic network process (ANP) method. The effectiveness of the approach is tested by an actual NPD project. The results show that the approach can reflect the comple...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Smart and resilient transportation
سال: 2021
ISSN: ['2632-0487']
DOI: https://doi.org/10.1108/srt-10-2020-0024