Research on flexible job shop scheduling with low-carbon technology based on quantum bacterial foraging optimization

نویسندگان

چکیده

Abstract In order to further reduce the carbon emission of manufacturing process in flexible job shop, a multi-objective integrated optimization model job-shop scheduling (FJSP) is proposed. A mathematics built this paper minimize makespan, total workload machines and emissions optimize method each machine characteristic, sequence allocation. Considering many parameters are interactional be optimized proposed model, quantum bacterial foraging designed code related parameters. On basis Kacem example through experimental simulation, performance was analysed with ANOVA, by comparing algorithms current separated planning scheduling, effect on reducing practical requirements FJSP verified.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flexible Assembly Job Shop Scheduling Based on Tabu Search

Flexible assembly job shop scheduling has been proved to be an NP-hard problem. To reduce the complexity, it is always divided into 2 sub-problems: routing sub-problem and sequencing sub-problem. In this paper, in order to develop a solution with high accuracy, we propose a method that can deal with these two sub-problems concurrently. Tabu search, one of the meta-heuristics, is adopted. Some e...

متن کامل

Solving Flexible Job Shop Scheduling with Multi Objective Approach

  In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...

متن کامل

Flexible job shop scheduling under availability constraints

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

متن کامل

An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method

In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...

متن کامل

Optimality of the flexible job shop scheduling system based on Gravitational Search Algorithm

The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Low-carbon Technologies

سال: 2021

ISSN: ['1748-1325', '1748-1317']

DOI: https://doi.org/10.1093/ijlct/ctab005