Research on Cost Overrun Risk of Construction Phase of Vietnam Highway International Contracting Project

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Contracting Methods for Highway Construction

Transportation construction is a large industry—particularly highway construction, on which more than $50 billion is spent annually. Small improvements can result in significant savings in time and cost, as well as better quality and fewer disputes. In recent years, many innovations have occurred in highway construction. The atmosphere within the industry is highly charged with optimism, uncert...

متن کامل

Analysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks

Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...

متن کامل

Managing Cost Overrun Risk in Project Funding Allocation

This paper discusses decision making of project funding allocation under uncertain project costs. Because project costs are uncertain and funding allocations may not necessarily match the costs required, each project is inherently subject to a cost overrun risk (COR). In this paper, a model is proposed in which project cost is treated as a factor with a probability density function. The decisio...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Engineering

سال: 2016

ISSN: 1947-3931,1947-394X

DOI: 10.4236/eng.2016.83011