Research on Catastrophic Pillar Instability in Room and Pillar Gypsum Mining

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Toward Pillar Design to Prevent Collapse of Room-and-pillar Mines

In some instances, extensive room-and-pillar workings can collapse with little warning and pose a serious risk to underground miners. Traditional strength-based pillar design methods applicable to coal or hard-rock mines use a factor of safety defined as pillar strength divided by pillar stress. Factor of stability, defined as local mine stiffness divided by post-failure pillar stiffness, may o...

متن کامل

Long-Term Stability Evaluation and Pillar Design Criterion for Room-and-Pillar Mines

The collapse of abandoned room-and-pillar mines is often violent and unpredictable. Safety concerns often resulted in mine closures with no post-mining stability evaluations. As a result, large amounts of land resources over room-and-pillar mines are wasted. This paper attempts to establish an understanding of the long-term stability issues of goafs (abandoned mines). Considering progressive pi...

متن کامل

Noise variability in underground room and pillar coal mines.

Noise in an underground coal mine has dominant components generated mainly from 3 sources: (a) continuous mining machines, (b) roof bolters, and (c) cars/vehicles used to transport personnel and/or coal. Each of these 3 noise sources also has a number of well-defined sub-sources with their own noise characteristics. Sound level meters were used to collect noise data in the form of instantaneous...

متن کامل

Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran

Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method ...

متن کامل

Design concerns of room and pillar retreat panels

Why do some room and pillar retreat panels encounter abnormal conditions? What factors deserve the most consideration during the planning and execution phases of mining and what can be done to mitigate those abnormal conditions when they are encountered? To help answer these questions, and to determine some of the relevant factors influencing the conditions of room and pillar (R & P) retreat mi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2018

ISSN: 2071-1050

DOI: 10.3390/su10103773