Reconstruction of a hotel complex building part, taking into account the volumetric planning solution changes
نویسندگان
چکیده
The paper presents the hotel complex building reconstruction main stages. self-supporting wall stress-strain state analysis is carried out, taking into account organization of additional doorways in it. optimal parameters their location are given arising stress concentrators. procedure for performing production works given.
منابع مشابه
A Triangle Mesh Reconstruction Method Taking into Account Silhouette Images
In this paper, we propose a novel approach to reconstruct triangle meshes from point sets by taking the silhouette of the target object into consideration. Recently, many approaches have been proposed for complete 3D reconstruction of moving objects. For example, motion capture techniques are used to acquire 3D data of human motion. However, it needs to attach markers onto the joints, which res...
متن کاملDiscrete part design by taking manufacturing restrictions into account
• A submitted manuscript is the author's version of the article upon submission and before peer-review. There can be important differences between the submitted version and the official published version of record. People interested in the research are advised to contact the author for the final version of the publication, or visit the DOI to the publisher's website. • The final author version ...
متن کاملOptimal Electric Power Transmission Planning Taking Environmental Constraints into Account
As environmental criteria become more and more important for the energy systems operation and planning, this paper proposes a method that can support the decision makers in future electricity systems planning. The evaluation of future electric power transmission investment plans is based on a social welfare analysis when the external costs of production are internalized. The social benefit can ...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملGradient-index filters: conversion into a two-index solution by taking into account dispersion.
The possibility of converting the continuous refractive-index profile into a two-index solution is shown. The technique of conversion that is developed makes it possible to take dispersion into account. This ensures that it is possible to achieve a good agreement between theory and practice in a broad spectral range. Several gradient-index filters have been developed and produced, and measuring...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: E3S web of conferences
سال: 2021
ISSN: ['2555-0403', '2267-1242']
DOI: https://doi.org/10.1051/e3sconf/202128101018