Qualitative Approach Risk Period in Construction Projects
نویسندگان
چکیده
منابع مشابه
Equitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach
An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...
متن کاملequitable risk allocation in construction projects: fuzzy bargaining game approach
an equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. this research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...
متن کاملRisk Management in Construction Projects
The financial and economic crisis has had an adverse impact on the Lithuania’s economy and construction industry. The GDP of Lithuania grew slightly in 2010, in contrast to a decrease of 14.7% in 2009. Lithuania’s GDP increased from 1.3% in 2010 to 4.6% in 2011. Annual GDP growth decreased from its highest point of 6.7%, reached in the third quarter, to 4.4% in the last quarter of 2011 [1,2]. S...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملRisk Analysis for Design-Build Construction Projects: A Simplified Approach
Construction Projects are being implemented under different contract systems in the Midwest. Negotiated design-build has been a popular contract system in recent years. It provides various advantages through entailing the contractor to be responsible for the whole project. However, design-build turns out to be risky system for both owners and contractors unless the risks are identified, quantif...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Financial Risk Management
سال: 2012
ISSN: 2167-9533,2167-9541
DOI: 10.4236/jfrm.2012.13008