Project risk and appeals in U.S. Forest Service planning
نویسندگان
چکیده
منابع مشابه
Integrating fire risk into forest planning
The present thesis deals with the inclusion of fire risk considerations into forest planning in Catalonia (North-East Spain). The first part of the thesis focused on the modeling the susceptibility of different kinds of forest to fire (Studies I, II, III and IV), and the second part on the inclusion of the acquired knowledge about fire risk into forest planning systems (Studies V and VI). The m...
متن کاملDevelopment history and bibliography of the US Forest Service crown-condition indicator for forest health monitoring.
Comprehensive assessment of individual-tree crown condition by the US Department of Agriculture, Forest Service, Forest Inventory and Analysis (FIA) Program has its origins in the concerns about widespread forest decline in Europe and North America that developed in the late 1970s and early 1980s. Programs such as the US National Acid Precipitation Assessment Program, US National Vegetation Sur...
متن کاملUsing fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملA New Multi-objective Model for Multi-mode Project Planning with Risk
The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Environmental Impact Assessment Review
سال: 2013
ISSN: 0195-9255
DOI: 10.1016/j.eiar.2012.11.001