Project Cost Overrun Risk Prediction Using Hidden Markov Chain Analysis

نویسندگان

چکیده

Construction project cost overrun is a common problem in the construction industry. The of projects thought to have increased by approximately 33% on average. Several types research been conducted and these generally rely historical data. However, whilst each has its own characteristics trend, real-time data are more reliable forecast trend. This paper proposes hidden Markov chain (HMM) model predict risk based project-owned performance corrective actions if adopted. events occurrence this was assumed follow Poisson arrival pattern. Real-time HMM with particle filter used run simulation. One SRC building Taiwan for validation comparison. posterior probabilities from were highly consistent ratios real projects. proposed prediction could provide an early alert overruns manager. Based survey significantly influential factors, we propose effective management plans alleviate frequency overrun.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

analysis of ruin probability for insurance companies using markov chain

در این پایان نامه نشان داده ایم که چگونه می توان مدل ریسک بیمه ای اسپیرر اندرسون را به کمک زنجیره های مارکوف تعریف کرد. سپس به کمک روش های آنالیز ماتریسی احتمال برشکستگی ، میزان مازاد در هنگام برشکستگی و میزان کسری بودجه در زمان وقوع برشکستگی را محاسبه کرده ایم. هدف ما در این پایان نامه بسیار محاسباتی و کاربردی تر از روش های است که در گذشته برای محاسبه این احتمال ارائه شده است. در ابتدا ما نشا...

15 صفحه اول

Managing Cost Overrun Risk in Project Funding Allocation

This paper discusses decision making of project funding allocation under uncertain project costs. Because project costs are uncertain and funding allocations may not necessarily match the costs required, each project is inherently subject to a cost overrun risk (COR). In this paper, a model is proposed in which project cost is treated as a factor with a probability density function. The decisio...

متن کامل

Relative Entropy Rate between a Markov Chain and Its Corresponding Hidden Markov Chain

 In this paper we study the relative entropy rate between a homogeneous Markov chain and a hidden Markov chain defined by observing the output of a discrete stochastic channel whose input is the finite state space homogeneous stationary Markov chain. For this purpose, we obtain the relative entropy between two finite subsequences of above mentioned chains with the help of the definition of...

متن کامل

Multilocus tetrasomic linkage analysis using hidden Markov chain model.

The availability of reliable genetic linkage maps is crucial for functional and evolutionary genomic analyses. Established theory and methods of genetic linkage analysis have made map construction a routine exercise in diploids. However, many evolutionarily, ecologically, and/or agronomically important species are autopolyploids, with autotetraploidy being a typical example. These species under...

متن کامل

Person Movement Prediction Using Hidden Markov Models

Abstract: Ubiquitous systems use context information to adapt appliance behavior to human needs. Even more convenience is reached if the appliance foresees the user’s desires and acts proactively. This paper introduces Hidden Markov Models, in order to anticipate the next movement of some persons. The optimal configuration of the model is determined by evaluating some movement sequences of real...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Buildings

سال: 2023

ISSN: ['2075-5309']

DOI: https://doi.org/10.3390/buildings13030667