Preventive maintenance scheduling of multi-component systems with interval costs
نویسندگان
چکیده
منابع مشابه
Preventive maintenance scheduling of multi-component systems with interval costs
We introduce the preventive maintenance scheduling problem with interval costs (PMSPIC), which is to schedule preventive maintenance (PM) of the components of a system over a finite and discretized time horizon, given a common set-up cost and component costs dependent on the lengths of the maintenance intervals. We present a 0-1 integer linear programming (0-1 ILP) model for the PMSPIC; the mod...
متن کاملJIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملLong Term Cost Effective Preventive Maintenance Scheduling
Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...
متن کاملComponent redundancy allocation in optimal cost preventive maintenance scheduling
This work presents a methodology to assess maintenance teams in the determination of the degree of redundancy that an active component must have in order to minimize its system life-cycle cost and in the definition of the corresponding maintenance plan schedule. The minimal required data are three average costs and one reliability function. It is useful in a system’s design phase, since in this...
متن کاملA Genetic Algorithm Approach for Multi-category Preventive Maintenance Scheduling
In the literature, preventive maintenance (PM) tasks are treated as one category of work such that they were interchangeable in scheduling. It is not practical in the real production system as different categories of maintenance tasks should be independent. Thus, this work modeled a new Production-Maintenance Scheduling (PMS) problem that considered different categories of maintenance with diff...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computers & Industrial Engineering
سال: 2014
ISSN: 0360-8352
DOI: 10.1016/j.cie.2014.02.009