Performance measurement indices for simulated construction operations

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Visualizing Simulated Construction Operations

Simulation modeling and visualization can substantially help in designing complex construction operations and in making optimal decisions where traditional methods prove ineffective or are unfeasible. However, there has been limited use of simulation in planning construction operations due to the unavailability of appropriate support tools that can provide users with a more realistic and compre...

متن کامل

Enabling 3D Visualization of Simulated Construction Operations

(ABSTRACT) Simulation modeling and visualization can substantially help in designing complex construction operations and in making optimal decisions where traditional methods prove ineffective or are unfeasible. However, there has been limited use of simulation in planning construction operations due to the unavailability of appropriate visual communication tools that can provide users with a m...

متن کامل

Efficient Interference Detection in 3D Animations of Simulated Construction Operations

This paper presents research that led to the design and implementation of efficient interference detection methods that can be used to identify and report undesirable conflicts that occur among static (e.g. structure in-place, idle equipment), dynamic (e.g. active machines and workers), and abstract (e.g. hazard spaces) construction resources in 3D animations of discrete-event simulation models...

متن کامل

Performance Measurement Systems in Construction

In the manufacturing and construction industries, performance measurement is used as a systematic way of judging project performance by evaluating the inputs, outputs and the final project outcomes. However, very few companies systematically measure their performance in a holistic way. Moreover, the existing systems tend to focus more on product and less on process and design. This can lead to ...

متن کامل

Performance measurement in construction logistics

The need for performance measurement systems is imminent in the construction "rms. Construction "rms have many simultaneously ongoing construction projects, from which the relevant performance information is needed. There are also tens of material groups and subcontractors, whose performance should be monitored together with construction "rms' practices. In addition to monitoring, performance m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Canadian Journal of Civil Engineering

سال: 2001

ISSN: 1208-6029,0315-1468

DOI: 10.1139/cjce-28-3-383