Overrun Factors During the Construction Phase of Project

نویسندگان

چکیده

The construction sector contributes to a country's development by providing real solutions human needs, improving the gross domestic product (GDP)and job opportunities. Besides numerous benefits, industry is resource-driven and faces many challenges. One of challenges complete project on time within budget that momentous for client, consultant, contractor. However, cost overrun are most common anomalies due improper management constructions. Hence, this article aimed recognize affecting causative factors delays projects. detailed literature comprehensively reviewed from 49 research articles past three decades found 'delay in payment' repeated factor mentioned 35 researchers their studies. 'poor site management,' labor, material related factors, design with errors' reported delay overrun. This paper also suggests appropriate strategies techniques minimize overruns uncovered previous literature.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Environmental risk assessment of a dam during construction phase

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...

متن کامل

the effect of e-64 on the developmental competence of sheep cocs during in vitro maturation

in the present study, the effect of e-64 at different concentrations (0.5, 1, 5 and 10 µm) added to (1) the ivm medium on oocyte nuclear maturation and developmental competence of ovine oocytes, and (2) to the ivc medium on embryonic development of ovine embryos were investigated.

Life cycle assessment of construction phase of monorail project in Qom, Iran

Transportation is an important part of modern community life as well as one of the largest sources of greenhouse gas emissions in urban communities, the population growth of which can increase transportation capacity. Monorail systems are relatively new rail transportation systems which are currently being designed and constructed in different countries. We have applied the Intergovernmental Pa...

متن کامل

Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman

Several studies have been carried out to investigate the causes of project cost overrun in different industries worldwide. This paper reports on the results of a study investigating the factors causing project cost overrun in Oman. Data required for this study were collected from 44 project engineers and managers of client and contracting companies involved in telecommunications projects. Accor...

متن کامل

Life cycle assessment of construction phase of monorail project in Qom, Iran

Transportation is an important part of modern community life as well as one of the largest sources of greenhouse gas emissions in urban communities, the population growth of which can increase transportation capacity. Monorail systems are relatively new rail transportation systems which are currently being designed and constructed in different countries. We have applied the Intergovernmental Pa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Sustainable Construction Engineering and Technology

سال: 2021

ISSN: ['2600-7959', '2180-3242']

DOI: https://doi.org/10.30880/ijscet.2021.12.03.010