Optimistic Bias in Time and Cost Estimation for Solar Power Plant Project
نویسندگان
چکیده
منابع مشابه
Pre-Feasibility Study of a Solar Power Plant Project: Case of Ahwaz City
Ahwaz city located in area 8136 square kilometers with population 1338126 people in southwest of Iran in center of Khuzestan province. This city received average 19.56 megajol per square meter per day, average annual sunny day 3088.2 hours, skyline coefficient greater than 0.64 and air transparency more than 0.776 are high potential for use in solar energy systems. In this research, fuzzy AHP a...
متن کاملA three- stage algorithm for software cost and time estimation in fuzzy environment
In this paper an efficient three- stage algorithm is developed for software production cost and time estimation. First stage includes a hybrid model composed of COCOMO and Function Points methods to increase estimation accuracy. Second stage encompasses paired comparisons matrix of analytical hierarchy process to determine amount of any resources consumed in each step of software production by ...
متن کاملOptimistic bias and food.
Food consumption patterns are influenced by a number of factors, including social and cultural factors. It is difficult to effect dietary change, and one possible barrier to dietary change is optimistic bias. Research indicates that individuals tend to believe that they are less likely to experience negative events, and more likely to experience positive events than their peers; this phenomenon...
متن کاملpersonal fable: optimistic bias in cigarette smokers
background several empirical studies have shown the attitude of smokers to formulate judgments based on distortion in the risk perception. this alteration is produced by the activation of the optimistic bias characterized by a set of the unrealistic beliefs compared to the outcomes of their behavior. this bias exposes individuals to adopt lifestyles potentially dangerous for their health, under...
متن کاملEffects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile
This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Conference SENATIK STT Adisutjipto Yogyakarta
سال: 2018
ISSN: 2528-1666,2337-3881
DOI: 10.28989/senatik.v4i0.223