Operating experience of GlossTrol.

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Operating Experience with Raydac

THE RA YDAC acceptance tests were run from June 4 to July 19, 1952, in five sessions of 3 days each. The tests were divided into three phases. Phase 1 consisted of programmed test routines which caused each unit of the computer to go through its various combinations of operations. This included tests of the terminal equipment, central control, and internal memory; the arithmetic unit; and the e...

متن کامل

LENS Operating Experience

Indiana University is operating a Low Energy Neutron Source which provides cold neutrons for material research and neutron physics and MeV energy for the neutron radiation effects studies. Neutrons are being produced by a 13 MeV proton beam incident on a Beryllium target. The LENS Proton Delivery System (PDS) is routinely operating at 13 MeV and 25 mA at 1.8% duty factor. The RF system, consist...

متن کامل

Experience Operating Systems

Teaching operating system need also practical experiments. Practical exercises in operating system up to now suffer from a high complexity of the experimental system, from concealing the internals of the operating system, and a scarce visibility of the phenomenon. The new capabilities of modern computers, and devices, respectively, associated with new concepts of operating system practical exer...

متن کامل

Operating Experience of Mitsubishi Pilot Paper Machine

To respond to the market needs of the increase of machine speed and improvement of the paper quality, paper machine supplier is demanded that it is going to develop the device that input with new technology and improve the machine performance. We decide the concept of the machine, after we conducted various element tests in the research division with part by part and confirm the concept on the ...

متن کامل

Operating Experience of the J-PARC Linac

The beam commissioning of the J-PARC linac started in November 2006 and 181 MeV acceleration was successfully achieved in January 2007. The linac has delivered beams to the 3 GeV Rapid Cycling Synchrotron for its commissioning, and then, the subsequent Main Ring Synchrotron and the neutron target commissioning. The linac uses a Cs-free LaB6-driven ion source and 20 units of 324 MHz klystrons. A...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: JAPAN TAPPI JOURNAL

سال: 1995

ISSN: 0022-815X,1881-1000

DOI: 10.2524/jtappij.49.56