On an EOQ model with service level constraint under fuzzy-stochastic demand and variable lead-time

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Relief Order Quantity under Stochastic Demand and Lead-time

In this paper, a newsboy model is developed under uniformly distributed lead-time and demand that is an appropriate assumption in obtaining optimal relief inventory of humanitarian disasters. It is noteworthy that limited historical data are in hand on relief operations. Hence, analytical and approximate solutions for optimal relief order quan­tity were derived. The effect of lead-time uncertai...

متن کامل

Min-max distribution free continuous-review model with a service level constraint and variable lead time

In this paper, we provide a continuous-review (Q, r, L) inventory model with a fill rate service constraint and a negative exponential crashing cost function with a variable lead time. Tajbakhsh [1] developed a closed-form solution that considered an order quantity and a reorder point. We extend the distribution free continuous-review inventory model to minimize the total cost by using a negati...

متن کامل

Setup Cost and Lead Time Reductions on Stochastic Inventory Models with a Service Level Constraint

The stochastic inventory models analyzed in this paper explore the problem of lead time associated with setup cost reductions for the continuous review and periodic review inventory models. For these two models with a mixture of backorders and lost sales, we respectively assume that their mean and variance of the lead time demand and protection interval (i.e., lead time plus review period) dema...

متن کامل

An integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production

In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...

متن کامل

Capacity expansion under a service level constraint for uncertain demand with lead times

For a service provider facing stochastic demand growth, expansion lead times and economies of scale complicate the expansion timing and sizing decisions. We formulate a model to minimize the infinite horizon expected discounted expansion cost under a service level constraint. The service level is defined as the proportion of demand over an expansion cycle that is satisfied by available capacity...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Mathematical Modelling

سال: 2015

ISSN: 0307-904X

DOI: 10.1016/j.apm.2015.03.035