OmpA: A Flexible Clamp for Bacterial Cell Wall Attachment
نویسندگان
چکیده
منابع مشابه
Bacterial Wall Attachment in a Flow Reactor
A mathematical model of microbial growth for limiting nutrients in a fully three dimensional flow reactor which accounts for the colonization of the reactor wall surface by the microbes is studied analytically. It can be viewed as a model of the large intestine or of the fouling of a commercial bioreactor or pipe flow. Two steady state regimes are identified, namely, the complete washout of the...
متن کاملBacterial Wall Attachment in a Flow Reactor: Mixed Culture
A mathematical model of a mixed culture of bacteria in a fully three dimensional flow reactor which accounts for the colonization of the reactor wall surface by the microbes is studied both analytically and by simulation. It can be viewed as a model of the large intestine or of the fouling of a commercial bio-reactor or pipe flow. The primary focus is on coexistence of microbial populations in ...
متن کاملBacterial Cell Wall-induced Immunosuppression
Asingle intraperitoneal injection of bacterial cell walls derived from groupA streptococci (SCW)' into susceptible rats results in the development of acute and chronic erosive polyarthritis (1, 2) . The pathology of the lesion leading to joint destruction has been shown to be aT cell-dependent, cell-mediated response to the deposition of the group A streptococcal peptidoglycan-polysaccharide po...
متن کاملCell wall attachment of a widely distributed peptidoglycan binding domain is hindered by cell wall constituents.
The C-terminal region (cA) of the major autolysin AcmA of Lactococcus lactis contains three highly similar repeated regions of 45 amino acid residues (LysM domains), which are separated by nonhomologous sequences. The cA domain could be deleted without destroying the cell wall-hydrolyzing activity of the enzyme in vitro. This AcmA derivative was capable neither of binding to lactococcal cells n...
متن کاملA HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL
This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Structure
سال: 2016
ISSN: 0969-2126
DOI: 10.1016/j.str.2016.10.009