Numerical simulation of hillside mine waste dump construction

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Chapter 11: Mine Waste Dump

The Overburden of waste and uneconomic mineralized rock is required to be removed to mine the useful mineral resource in a surface mining operation. In this process a dump is formed by casting the waste material and dumping it in nearby area. The dump so formed is known as mine waste dump. Waste dump may be classified as internal and external dump. External dump is created outside the pit where...

متن کامل

Remote Sensing Detection for Subsidence-resulted Water Body and Solid-waste Dump in Coal Mine: Yanzhou Being a Case

Taking LandSat TM/ETM+ images as information source, this paper used the Normalized Difference Water Index (NDWI) to extract mining subsidence-resulted surface water body information in Yanzhou coal mining area. It was found that the extracted water body information would be mixed with solid-waste dumps. Taking DN 40 in band 5 as threshold value, the water bodies and solid-waste dumps were iden...

متن کامل

Optimization of the Waste Management for Construction Projects Using Simulation

Growth in construction activities increases the amount of construction waste generated. Recycling of construction waste is an important component of environmentally responsible construction, as it reduces the amount of waste directed to landfills. In addition, it enhances the resource recovery for future construction work. A model is presented in this paper to predict waste generation rates, as...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Rem: Revista Escola de Minas

سال: 2012

ISSN: 0370-4467

DOI: 10.1590/s0370-44672012000400018