Nonparametric Confidence Limits of Quantile-Based Process Capability Indices
نویسندگان
چکیده
منابع مشابه
A Bootstrap Confidence Limit for Process Capability Indices
The process capability indices are widely used by quality professionals as an estimate of process capability. The lower confidence limits of PCIs are difficult to be estimated by parametric methods for some non-normal distributed processes. The non-parametric but computer intensive Bootstrap techniques are utilized for these cases. The Percentile-t Bootstrap (PTB) method is used to estimate the...
متن کاملUnderstanding Process Capability Indices
1. Introduction A process capability index is a numerical summary that compares the behavior of a product or process characteristic to engineering specifications. These measures are also often called capability or performance indices or ratios; we use capability index as the generic term. A capability index relates the voice of the customer (specification limits) to the voice of the process. A ...
متن کاملResiduals based process capability indices for two-stage processes
The manufacturing operations often involve multistage processes where the process capability of each stage is affected by the process capability of its precedent processes. This property is known as the cascade property. The purpose of this paper is to estimate the process capability of the second stage of two-stage process while the cascade property impact is removed using residuals analysis. ...
متن کاملCapability Indices for Rayleigh Process
Monitoring, control and improvement of quality are important for companies. Process capability indices (PCIs) are tools widely used by the industries to determine the quality of their products and the performance of their manufacturing processes. Classic versions of these indices were constructed for processes whose quality characteristics have a normal distribution. But, many of these ...
متن کاملProcess Yield and Capability Indices
Capability indices measure the performance of a process. Although process yield is the primary focus on the performance criteria, the " ( , ) p C u v indices combine process yield and process centering. With this compromise, there is no direct link between the process yield and these indices, but literature provides lower and upper bounds for the process yield. However errors in the proposed re...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Quality, Statistics, and Reliability
سال: 2012
ISSN: 1687-7144,1687-7152
DOI: 10.1155/2012/985152