Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study

Please cite this article in press as: Ciavotta, M., e prehensive study. European Journal of Operatio The permutation flowshop scheduling problem has been thoroughly studied in recent decades, both from single objective as well as frommulti-objective perspectives. To the best of our knowledge, little has been done regarding the multi-objective flowshop with Pareto approach when sequence dependen...

متن کامل

A Multi-objective Immune System for a New Bi-objective Permutation Flowshop Problem with Sequence-dependent Setup Times

 We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is ...

متن کامل

A Multi-objective Immune System for a New Bi-objective Permutation Flowshop Problem with Sequence-dependent Setup Times

We present a new mathematical model for a permutation flowshop scheduling problem with sequence-dependent setup times considering minimization of two objectives, namely makespan and weighted mean total earliness/tardiness. Only small-sized problems with up to 20 jobs can be solved by the proposed integer programming approach. Thus, an effective multi-objective immune system (MOIS) is specially ...

متن کامل

A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times

This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...

متن کامل

New results for the multi-objective sequence dependent setup times flowshop problem

Although many papers deal with the permutation flowshop scheduling problem with or without setups, according to our knowledge, little has been published tackling multi-objective optimization in presence of sequence dependent setup times. Hence, in this work we cope with this problem considering two pairs of well known independent objectives, the Cmax−TWT (Makespan-Total Weighted Tardiness ) and...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2013

ISSN: 0377-2217

DOI: 10.1016/j.ejor.2012.12.031