Multi-granular linguistic distribution evidential reasoning method for renewable energy project risk assessment

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hierarchal Risk Assessment Model Using the Evidential Reasoning Rule

This paper aims to develop a hierarchical risk assessment model using the newlydeveloped evidential reasoning (ER) rule, which constitutes a generic conjunctive probabilistic reasoning process. In this paper, we first provide a brief introduction to the basics of the ER rule and emphasize the strengths for representing and aggregating uncertain information from multiple experts and sources. Fur...

متن کامل

RES: A Relative Method for Evidential Reasoning

In this paper we describe a novel method for evidential reasoning [1]. It involves mod­ elling the process of evidential reasoning in three steps, namely, evidence structure con­ struction, evidence accumulation, and deci­ sion making. The proposed method, called 'RfS, is novel in that evidence strength is associated with an evidential support relationship (an argu­ ment) between a pair of stat...

متن کامل

Risk Assessment of E-Commerce Projects Using Evidential Reasoning

The purpose of this study is to develop a decision making system to evaluate the risks in E-Commerce (EC) projects. Competitive software businesses have the critical task of assessing the risk in the software system development life cycle. This can be conducted on the basis of conventional probabilities, but limited appropriate information is available and so a complete set of probabilities is ...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Information Fusion

سال: 2021

ISSN: 1566-2535

DOI: 10.1016/j.inffus.2020.08.010