Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method

Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...

متن کامل

An Integrated Approach of Fuzzy ANP and Fuzzy TOPSIS for R&D Project Selection: A Case Study

This paper presents an integrated fuzzy approach for selecting R&D project. In the integrated approach, fuzzy concepts are used for decision-makers’ subjective judgments to reflect the vague nature of the selection process. Fuzzy ANP and Fuzzy TOPSIS are included in the integrated approach. Fuzzy ANP is used to determine the fuzzy weights of criteria and sub-criteria. Fuzzy TOPSIS aims to rank ...

متن کامل

Project Selection by Using Fuzzy AHP and TOPSIS Technique

In this article, by using fuzzy AHP and TOPSIS technique we propose a new method for project selection problem. After reviewing four common methods of comparing alternatives investment (net present value, rate of return, benefit cost analysis and payback period) we use them as criteria in AHP tree. In this methodology by utilizing improved Analytical Hierarchy Process by Fuzzy set theory, first...

متن کامل

Using fuzzy FMEA and fuzzy logic in project risk management

Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...

متن کامل

Managing project interdependencies in IT/IS project portfolios: a review of managerial issues

Adequately managing project interdependencies among diverse and simultaneous projects is deemed critical for successful implementation of project portfolios. The challenge is significant because it may entail managing a complex network of project interdependencies that keeps changing over time. The present study investigates the managerial challenges that may undermine effective management of p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of System Assurance Engineering and Management

سال: 2020

ISSN: 0975-6809,0976-4348

DOI: 10.1007/s13198-020-00962-3