MIP-Based Stochastic Security-Constrained Daily Hydrothermal Generation Scheduling

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Static Security Constrained Generation Scheduling Using Sensitivity Characteristics of Neural Network

This paper proposes a novel approach for generation scheduling using sensitivitycharacteristic of a Security Analyzer Neural Network (SANN) for improving static securityof power system. In this paper, the potential overloading at the post contingency steadystateassociated with each line outage is proposed as a security index which is used forevaluation and enhancement of system static security....

متن کامل

Emission Constrained Hydrothermal Scheduling Algorithm

This paper presents an efficient emission constrained hydrothermal scheduling algorithm that deals with nonlinear functions such as the water discharge characteristics, thermal cost, and transmission loss. It is then incorporated into the hydrothermal coordination program. The program has been tested on a practical utility system having 32 thermal and 12 hydro generating units. Test results sho...

متن کامل

Scheduling security constraint unit commitment for power system including stochastic wind power generation

This paper introduces a new approach for scheduling security constraint unit commitment (SCUC) including wind farms. Because of uncertainty in wind power production, we tried to develop a new method for incorporating wind power generation in power plant scheduling. For this, wind power generation modeled with unit commitment in a non-linear optimization problem and simulated by submitting diffe...

متن کامل

Splittable stochastic project scheduling with constrained renewable resource

This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...

متن کامل

splittable stochastic project scheduling with constrained renewable resource

this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Systems Journal

سال: 2015

ISSN: 1932-8184,1937-9234,2373-7816

DOI: 10.1109/jsyst.2013.2289771