Method of coordinating joint operation of air starter and auxiliary power unit and determining the gas turbine engine starting time
نویسندگان
چکیده
منابع مشابه
hazard evaluation of gas condensate stabilization and dehydration unit of parsian gas refinery using hazop procedures
شناسایی مخاطرات در واحد 400 پالایشگاه گاز پارسیان. در این پروزه با بکارگیری از تکنیک hazop به شناسا یی مخاطرات ، انحرافات ممکن و در صورت لزوم ارایه راهکارهای مناسب جهت افزایش ایمنی فرا یند پرداخته میگردد. شرایط عملیاتی مخاطره آمیز نظیر فشار و دمای بالا و وجود ترکیبات مختلف سمی و قابل انفجار در واحدهای پالایش گاز، ضرورت توجه به موارد ایمنی در این چنین واحدهایی را مشخص می سازد. مطالعه hazop یک ر...
The required power of the MGT-40 gas turbine starter
Determination of the starter torque-speed diagram is a major task in the design or selection of a proper gas turbine starter. In this paper, the maximum power of the MGT-40 gas turbine starter was calculated based on the dynamics of the rotor, start-up logic, and compressor map. In a recent research, the pressure ratio was assumed as a linear function of the rotor speed and the required sta...
متن کاملThe required power of the MGT-40 gas turbine starter
Determination of the starter torque-speed diagram is a major task in the design or selection of a proper gas turbine starter. In this paper, the maximum power of the MGT-40 gas turbine starter was calculated based on the dynamics of the rotor, start-up logic, and compressor map. In a recent research, the pressure ratio was assumed as a linear function of the rotor speed and the required starter...
متن کاملHybrid Fuel Cell / Gas Turbine Systems Auxiliary Power Unit
Recent interest in fuel cell-gas turbine hybrid applications for the aerospace industry has led to the need for accurate computer simulation models to aid in system design and performance evaluation. To meet this requirement, solid oxide fuel cell (SOFC) and fuel processor models have been developed and incorporated into the Numerical Propulsion Systems Simulation (NPSS) software package. The S...
متن کاملthe required power of the mgt-40 gas turbine starter
determination of the starter torque-speed diagram is a major task in the design or selection of a proper gas turbine starter. in this paper, the maximum power of the mgt-40 gas turbine starter was calculated based on the dynamics of the rotor, start-up logic, and compressor map. in a recent research, the pressure ratio was assumed as a linear function of the rotor speed and the required starter...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: VESTNIK of Samara University. Aerospace and Mechanical Engineering
سال: 2020
ISSN: 2541-7533,2542-0453
DOI: 10.18287/2541-7533-2020-19-3-39-50