Improved Path Planning Method for Autonomous Loading Operation by Wheel Loader
Authors have been conducting research on an autonomous system for loading operation by wheel loader. In loading operation with V shape loading method, a time for travelling is the dominant factor for the cycle time. The path should be modified varied condition of the working place. To achieve quicker and reliable operation in autonomous loading operation, new path planning method is developed. ...
متن کاملDetection of Dump Truck for Loading Operation by Wheel Loader
The authors have been conducting development of an autonomous loading system by wheel loader. As a part of the development, a detection method of location of the dump truck will be described in this paper. In the process of loading to the truck in the operation, the loader approaches to the dump truck in very close distance. The function for collision avoidance between the loader and the truck ...
متن کاملOptimal Engine Operation in a Multi-Mode CVT Wheel Loader
Throughout the vehicular industry there is a drive for increased fuel efficiency. This is the case also for heavy equipment like wheel loaders. The operation of such machines is characterized by its highly transient nature, the episodes of high tractive effort at low speed and that power is used by both the transmission and the working hydraulics. The present transmission is well suited for thi...
متن کاملWheel loader optimal transients in the short loading cycle
A nonlinear wheel loader model with nine states and four control inputs is utilized to study the fuel and time efficient optimal control of wheel loader operation in the short loading cycle. The wheel loader model consists of lifting, steering and powertrain subsystems where the nonlinearity originates from the torque converter in the drivetrain. The short loading cycle, from loading point to a...
متن کاملThe Analysis of Wheel Loader Diesel Engine Crankshaft Failure
The main purpose of this study is to review the cause for the crankshaft failure of six-cylinder diesel engine of a wheel loader after passing a short period of time. The failure had occurred after 4800 hours of in-service in the fifth crankpin of the crankshaft. Hardness and tensile tests were carried out to study their mechanical properties. Spectrophotometer machine was used to examine the c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Shigen-to-Sozai
سال: 1996
ISSN: 0916-1740,1880-6244
DOI: 10.2473/shigentosozai.112.531