Machine Downtime Effect on the Warm-Up Period in an Economic Production Quantity Problem

نویسندگان

چکیده

Success in the industrial sector is compromised by diverse conditions such as imperfect product production, manufacturing line interruptions, and unscheduled maintenance. The precise use of common practices production environments an available solution to eliminate some these issues. Applying a warm-up period process adequate cost-effective for almost all companies. It improves equipment’s productivity helps generate fewer defective products. Even though several inventory management studies have included phase their models, its economic quantity (EPQ) models remains largely unexplored. Adding cycle minimizes maintenance expenses products increases machine’s performance. In this study, dependency between machine downtime length examined first time. time depends on off-state period: if has longer operation timeout, then needed. model includes function relative two types products: scrapping reworking items. study concluded with numerical examples, sensitivity analysis, insights related EPQ.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Extension to the Economic Production Quantity Problem with Deteriorating Products Considering Random Machine Breakdown and Stochastic Repair Time

The recent advances in manufacturing systems motivate several studies to focus on Economic Production Quantity (EPQ) problem. Althuogh there are several extentions to the EPQ, this paper provides a new extension by considering some of the real world parameters like: (a) shortages in the form of partial backordering, (b) inventory can deteriorate stochastically, (c) machine can break down stocha...

متن کامل

Determination of Economic Production Quantity with Regard to Machine Failure

In this paper, we study an economic production quantity (EPQ) problem in which an item is produced by a single machine. We assume that the machine may fail in an exponential random time. The repair time is an exponential random variable. It is possible to satisfy the demand from an outside supplier when the machine is failed. The objective is to determine the production and order quantities in ...

متن کامل

the washback effect of discretepoint vs. integrative tests on the retention of content in knowledge tests

در این پایان نامه تاثیر دو نوع تست جزیی نگر و کلی نگر بر به یادسپاری محتوا ارزیابی شده که نتایج نشان دهندهکارایی تستهای کلی نگر بیشتر از سایر آزمونها است

15 صفحه اول

The Simultaneous Effect of Holding Safety Stock and Purchasing Policies on the Economic Production Quantity Model Subject to Random Machine Breakdown

In this paper, we develop an economic production quantity (EPQ) model under machine breakdown and two types of repair (corrective and preventive). also, study the simultaneous effect of holding safety stock and purchasing policy. In order to avoid shortages occurring as a result of the random repair time, in addition to keep safety stock, we suppose that the manufacturer could purchase some qua...

متن کامل

the effect of e-64 on the developmental competence of sheep cocs during in vitro maturation

in the present study, the effect of e-64 at different concentrations (0.5, 1, 5 and 10 µm) added to (1) the ivm medium on oocyte nuclear maturation and developmental competence of ovine oocytes, and (2) to the ivc medium on embryonic development of ovine embryos were investigated.

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematics

سال: 2023

ISSN: ['2227-7390']

DOI: https://doi.org/10.3390/math11071740