The paper describes an analysis and detailed design of the 470 m long D4 motorway bridge in Slovak capital Bratislava. This is a part 2 932.50 crossing Danube River its surrounding areas. 210 main span post-tensioned three box girder longest which has ever been built Slovakia. Ministry Transportation Construction Republic requirement was to cross all future rowing tracks by single span. depth section varies from 4.39 at 13.09 piers. 35 wide carries 4-lane carriageway, median, sidewalk cycling path. central carriageway balanced cantilever method. overhangs carrying outer lanes are wing traveller machine supported precast struts. currently under construction as PPP project Bratislava ring road (the Bratislava, Jarovce - Ivanka north section).
منابع مشابه
Explanation of Excessive Long-Time Deflections of Collapsed Record-Span Box Girder Bridge in Palau
Explanation of the excessive deflections of the Koror-Babeldaob (KB) Bridge in Palau is presented. This bridge was built in 1977 by the cantilever method and collapsed 3 months after remedial prestressing in 1996. It was a segmental prestressed concrete girder having the worldrecord span of 241 m (790 ft.) and maximum girder depth of 14.17 m (46.5 ft). The final mid-span deflection was in desig...
متن کاملDrying and Cracking Effects in Box-girder Bridge Segment
This paper deals with the effect of drying as a moisture diffusion process in a segment of a typical box-girder bridge. Pore relative humidity distributions throughout the cross sections of the plates of the girder are calculated from the diffusion equation, taking its nonlinearity and aging into account. The effect of creep with aging on the stresses produced by drying shrinkage is taken into ...
متن کاملPrecast, Pretensioned, Post-Tensioned Concrete for Bridge Decks
The problem of concrete bridge deck deterioration on many of our newer as well as older bridges is severe, somewhat perplexing as to cause, and difficult to solve. Furthermore, the cost to highway agencies for their repair, and the cost of delay to the highway user, can be extremely large. The use of precast, prestressed concrete for bridge decks is a con cept of construction or reconstruction...
متن کاملLoad Test and Model Calibration of a Horizontally Curved Steel Box-Girder Bridge
In this paper, full scale load test of a horizontally curved steel box-girder bridge is carried out in order to detect structural defects, which reportedly result in unwanted vibrations in nearby buildings. The bridge is tested under the passage of six heavy vehicles at different speeds, so as to determine its static and dynamic responses. A total number of one hundred and two (102) sensors are...
متن کاملHistorical view of long-span bridge aerodynamics
Some features of bridge aerodynamics of wind engineering are reviewed at this time, in view of the collapse of the Tacoma Narrows Bridge and also to celebrate Professor Alan G. Davenport’s 40 years of contribution to the field. Primary highlighted topics are: description of motion-dependent forces for flutter instability, presentation of gust responses caused by turbulent winds and suppression ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Acta Polytechnica CTU Proceedings
سال: 2022
ISSN: ['2336-5382']
DOI: https://doi.org/10.14311/app.2022.33.0063