DONES is planned to operate on a continuous basis with only two beam stop periods per year for maintenance. The operational availability 70 %, which calls carefully analyzed preventive purpose of the research propose realistic and comprehensive logistics maintenance plan. All activities are included in Maintenance Matrix based Plant Breakdown Structure project. This creation plan that will lead Work Schedule. Special mention within this matrix be given those operations must order comply regulation. need replacement components impose some requirements dimensions architectural features main building such as doors, airlocks, corridors shipping bays. To enable these replacements, flow materials has been developed by an intralogistics simulation AnyLogic. results modifications either or replacements feasible. periodic activated component using FMEA methodology resulting proposals plant equipment designers well remote handling designers. Virtual reality simulations used staged approach operation. HEBT scraper helped define detail each step tool proven very useful prompt changes both design equipment. Also, procedure operation itself can refined optimized. conclusion contribution definition building, achievement target availability.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Facility Location Model for Reverse Logistics

This paper presents a study that characterizes, formulates, and solves the reverse logistic network design. A Mixed Linear Program model is formulated that systematically minimizes reverse logistics operating costs for the strategic problem facility location of collection sites, cannibalization and recycling. The facility location is a central issue of the logistics networks. In this paper we a...

متن کامل

A facility location model for logistics systems including reverse flows: The case of remanufacturing activities

After a brief introduction to the basic concepts of reverse logistics, we present a two-level location problem with three types of facility to be located in a specific reverse logistics system, named a Remanufacturing Network (RMN). For this problem, we propose a 0–1 mixed integer programming model, in which we simultaneously consider “forward” and “reverse” flows and their mutual interactions....

متن کامل

Advanced logistics planning for offshore wind farm operation and maintenance activities

Offshore wind turbine technology is moving forward as a cleaner alternative to the fossil fuelled power production. However, there are a number of challenges in offshore; wind turbines are subject to different loads that are not often experienced onshore and more importantly challenging wind and wave conditions limit the operability of the vessels needed to access offshore wind farms. As the po...

متن کامل

Robust Logistics Network Design with Facility Disruptions

This paper studies a strategic supply chain management problem to design robust networks that perform well under both normal conditions and when disruptions strike. We present a mixed-integer programming model whose objective is to minimize the nominal cost (the cost when no disruptions occur) while reducing the disruption risk using the p-robustness criterion (which bounds the cost in disrupti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Fusion Engineering and Design

سال: 2023

ISSN: ['1873-7196', '0920-3796']

DOI: https://doi.org/10.1016/j.fusengdes.2023.113630