KAJIAN FAKTOR PENYEBAB COST OVERRUN PADA PROYEK KONSTRUKSI GEDUNG

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Evaluation Method Based on Matter-Element and Hierarchy Model

Abstrak Evaluasi proyek selalu menjadi kunci dari manajemen proyek rekayasa. Evaluasi proyek adalah pekerjaan yang kompleks yang melibatkan banyak faktor. Hasil evaluasi akhir selalu dipengaruhi langsung oleh definisi indeks evaluasi yang bervariasi dan bobot yang terkait. Makalah ini terutama mempelajari penilaian kemampuan para ahli dan pembentukan sistem evaluasi proyek indeks dalam tinjauan...

متن کامل

Simple ROI untuk justifikasi investasi proyek Data Warehouse pada perguruan tinggi swasta

Decreasing new students for private high education push the management particularly for high level management for making an information which can help them to make decisions in order for competition with other high educations. One of way out by building with information technology approaching like data warehouse for data handling and making the best decisions. Simple ROI is used for project jus...

متن کامل

Project Cost Overrun Simulation in Software Product Line Development

The cost of a Software Product Line (SPL) development project sometimes exceeds the initially planned cost, because of requirements volatility and poor quality. In this paper, we propose a cost overrun simulation model for time-boxed SPL development. The model is an enhancement of a previous model, specifically now including: consideration of requirements volatility, consideration of unplanned ...

متن کامل

Managing Cost Overrun Risk in Project Funding Allocation

This paper discusses decision making of project funding allocation under uncertain project costs. Because project costs are uncertain and funding allocations may not necessarily match the costs required, each project is inherently subject to a cost overrun risk (COR). In this paper, a model is proposed in which project cost is treated as a factor with a probability density function. The decisio...

متن کامل

Isolation, Detection and Genomic Differentiation of Vibrio cholerae and Vibrio parahaemolyticus in Bachok, Kelantan

The objective of this study was to determine the genetic diversity and virulence factors of Vibrio cholerae and V. parahaemolyticus from selected aquatic environments in Bachok, Kelantan, Malaysia. Out of 50 water samples, 33 were confirmed with the presence of presumptive V. cholerae and V. parahaemolyticus based on biochemical tests. Primers targeting toxR gene specific for V. cholerae (800bp...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Teknik Mesin

سال: 2017

ISSN: 2549-2888,2089-7235

DOI: 10.22441/jtm.v6i2.1187