Jósa András Hospital Complex Project - Cost-Benefit Analysis Of The Major Project Investment

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cost- Benefit Analysis of Gas to Liquids Project for the South-Pars Gas Field of Iran

This paper presents an economic evaluation of gas to liquids (GTL) project using “South-Pars” gas field of Iran based on the latest actual performing GTL projects. Iran has the world’s largest reserves of natural gas and can satisfy the projected long-term market demand of GTL products which have lower pollution and higher quality than refinery products. The results of cost-benefit analysis sho...

متن کامل

cost- benefit analysis of gas to liquids project for the south-pars gas field of iran

this paper presents an economic evaluation of gas to liquids (gtl) project using “south-pars” gas field of iran based on the latest actual performing gtl projects. iran has the world’s largest reserves of natural gas and can satisfy the projected long-term market demand of gtl products which have lower pollution and higher quality than refinery products. the results of cost-benefit analysis sho...

متن کامل

Contemporary methods for evaluating complex project proposals

The ability to evaluate project proposals, assessing future success, and organizational value is critical to overall business performance for most enterprises. Yet, predicting project success is difficult and often unreliable. A four-year field study shows that the effectiveness of available methods for evaluating and selecting large, complex project depends on the specific project type, org...

متن کامل

Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile

This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Value in Health

سال: 2015

ISSN: 1098-3015

DOI: 10.1016/j.jval.2015.09.1673